ELECTRICAL ESTIMATING SOFTWARE

Estimating software that understands the electrical system.

Most electrical estimating software is very good at the arithmetic and indifferent to the electrical job underneath it. You count symbols, assign assemblies, apply labor units, and the software prices what you fed it. What it cannot tell you is whether what you fed it was right.
In Development

VoltDrop is not an estimating system and does not replace one. It is the layer that prepares the electrical job before pricing.

Where estimates actually go wrong

Estimating errors are rarely arithmetic errors. They are scope errors: a disconnect that both divisions assumed the other was furnishing, a feeder that was revised in an addendum after the one-line was drawn, a panel schedule that lists circuits the power plan never tags.

By the time those show up, they are change orders, RFIs, or margin. The math was fine. The understanding of the job was not.

  • Scope assumed, not confirmed

    Responsibility for equipment disconnects, controls wiring, and equipment connections often sits in the gap between Division 26 and the mechanical drawings.

  • Revisions applied unevenly

    An addendum changes a breaker; the one-line is not reissued. Both documents are now in the set and they disagree.

  • Quantities without provenance

    A number in a takeoff that nobody can trace back to a sheet is a number nobody can defend in a scope review.

  • Feeders priced from a symbol

    A feeder tag on a one-line is not a length, a raceway, or a pull. Someone still has to decide what it takes to install.

What VoltDrop does before the estimate

VoltDrop sits upstream of pricing. It reads the contract set — drawings, specifications, schedules, addenda, and the mechanical and architectural information that bears on electrical scope — and produces a structured account of what the electrical job actually contains.

That structure is what goes into your estimating system. The pricing stays where it is; what changes is the confidence in what you are pricing.

  • Electrical obligations pulled from across the set, not one sheet at a time
  • Quantities linked to the drawing or specification section they came from
  • Feeders and homeruns as structured runs with source, destination, and length
  • Conflicts and missing information flagged rather than silently assumed
  • Voltage drop, conductor sizing, and conduit fill verified by deterministic engines

Deterministic math, not generated numbers

Critical electrical calculations run through calculation engines with published methods and code references — not through a language model. Voltage drop uses NEC Chapter 9 Table 8 circular mils with temperature correction; ampacity comes from the 75°C column of NEC 310.16; conduit fill uses Chapter 9 Tables 1, 4, and 5.

AI is used where the work is genuinely reading and reconciling documents. It is not used to invent engineering results.